Common Adjustment Methods For Anchor Drill Rigs in Engineering
Oct 12, 2026
Common adjustment methods for anchor drill rigs in engineering
In the construction of projects of different textures, the adjustment of anchor drill rigs is inevitable. The adjustment methods used also need to be adjusted accordingly with the different construction environments. Now, let's introduce some adjustment methods for anchor drill rigs to you.

1.The newly produced anchor drill rig will have a running-in period, which is approximately one month. During this period, we should comprehensively inspect the cleanliness of the oil system of the drill rig. The drill rig is bound to encounter times when resistance is relatively large. At this time, we should replace the oil suction filter. If the oil deteriorates, the cause should be identified and replaced.
2.After the anchor drill has been in use for a period of time, the drill bit will become loose, showing up and down jumping or left and right swaying. At this point, we need to adjust the drill bit and fix it in place.
3. If there is air leakage in the power head, it indicates that the sealing performance at the sealing part of the power head has deteriorated. In this case, the rubber sealing ring needs to be replaced.
4. There is a rubber shock-absorbing ring between the drill pipe and the spline sleeve. This part also needs to be inspected in time. If there is any problem, it should be replaced at any time.
After adjusting the anchor drill rig, it can be of great help to everyone. We should promptly inspect and adjust the drill rig during the construction process.