Description

Product Description

 

The BGD-120S horizontal guided spiral pipe jacking drilling rig is suitable for trenchless projects in narrow roadways, tunnel pipe curtain, and smaller foundation pits such as sewage Wells and municipal engineering Wells on both sides of municipal roads. Road crossing horizontal drilling rig is suitable for pipe diameters ranging from 323 to 711mm, with a laying length of up to 100 meters, the precision reading error can be controlled within approximately 2 centimeters. The construction process is free from impact and vibration, requires no slurry, causes no pollution, and does not interfere with the stratum.

 

Technical Specifications

 

Engine

   

DCEC

 

QSB4.5-C160III

Rated output at 2200 rpm

kw

119

Electric system

V

24

Fuel tank capacity

L

380

Hydraulic system

Mpa

24

Auxiliary hydraulic system pressure

Mpa

20

Hydr. oil tank capacity

L

850

Max. torque at low speed

Nm

24000

High rotating speed

r/min

0-50

Low rotating speed

r/min

0-25

One step stroke

mm

300

Spindle clearance to ground

mm

673

Rotary head drifting distance

mm

320

Pushing speed

m/min

0-0.5

m/min

0-1.25

Pushing force

t

120

Duct tube diameter(optional)

mm

Φ325-Φ711

Dimension of power pack

mm

2280*1890*1620

Power pack weight

Kg

2400

 

Product Details

 

BGD-120S drill rig 1
BGD-120S drill rig 5
BGD-120S drill rig 7
BGD-120S drill rig 2
BGD-120S drill rig 3
BGD-120S drill rig 4

 

Construction Site

 

1BGD120S BGD-150S drill rig Construction case 1
2BGD120S drill rig Construction case 5
1BGD120S BGD-150S drill rig Construction case 2
2BGD120S drill rig Construction case 6

 

Standardized Construction Process

 

1

Preliminary Preparations: Excavation of work pits (main pit + auxiliary pit), underground utility detection, and equipment positioning and calibration.

2

Pilot Hole Drilling: Utilizing a directional control system, a high-precision pilot hole is drilled along the designed trajectory to reach the receiving end.

3

Reaming Operations: Spiral reamers of varying specifications are successively employed to gradually enlarge the borehole to the designed pipe diameter (1–2 cm larger than the pipe's outer diameter).

4

Pipe Pullback: Using spiral drill rods, the finished pipeline is smoothly pulled back into the borehole, while simultaneous soil removal is performed.

5

Concluding Phase: Equipment dismantling, pipe end treatment, and site cleanup and restoration.

 

Hot Tags: road crossing horizontal drilling rig, China road crossing horizontal drilling rig manufacturers, suppliers, factory, Diesel Horizontal Helical Drilling Rig, Guided Auger Boring Drill Rig, Horizontal Helical Drill Rigs, horizontal helical drilling rig, Horizontal Screw Drilling Rig, Road Crossing Horizontal Drilling Rig

(0/10)

clearall